Big Creek on Norris Lake
The weather in Lafollette, TN looks great for the coming week and will allow work to continue on the building site at Big Creek. All of the trenches have been dug and filled with paver base. The foundation is now level and strong and ready for installation of blocks to finish the retaining walls. On many of the lake homes on Norris Lake, retaining walls are used as structures designed to restrain soil to unnatural slopes. This helps resist the lateral pressure of soil when there is a change in ground elevation.